Cape Cod Canal Dredging Project Delayed

IMG_2120

Cape Cod Times: The long-awaited dredging of the Cape Cod Canal and restoration of Town Neck Beach will have to wait a bit longer, officials said.

Equipment has been moved into place and the metal piping that will pump sand onto Town Neck Beach is at the ready, but the dredge owned by Great Lakes Dredge & Dock Co. has not yet made it to local waters.

Read more about the delays to the Cape Cod Canal dredging project.